List of references

  • Geotechnical researches for the purpose of the Main design of the recovery of the road Ravna rijeka-Jasikovac, Investor: Directorate of Public Works, 2020.
  • Creation of exploitation wells for the water supply of the airport in Podgorica, Investor: Aerodromi Crne Gore AD (Airports of Montenegro, joint-stock company), 2019.
  • Recovery of the landslide ,,Markovići” on the main road Cetinje-Budva, the third (III) phase, Investor: Directorate for Traffic, 2019/21.
  • Design and construction of the water supply system of the hotel complex on Ada Bojana, Investor: HTP (Hotel and Tourist Enterprise) Ulcinjska Rivijera AD (joint-stock company), 2019/21.
  • Main design ”Stabilization of slopes in the segment of the local road Štitarička grla”, Investor: Municipality of Mojkovac, 2019.
  • Hydrogeological researches for the purpose of the water supply of the hotel complex on Ada Bojana, Investor: H.T.P. (Hotel and Tourist Enterprise) Ulcinjska Rivijera, 2018.
  • Engineering geological researches and preparation of the Survey report for the landslide on the road Jasikovac Cmiljača, the first (I) phase, Investor: Department of Public Works, 2018.
  • Hydrogeological researches and forming of the source for the water supply of 200 ha of agricultural land in the area of Šas, the Municipality of Ulcinj, Investor: Voli trade, 2018.
  • Creation of the primary and secondary hydrotechnical installations for the water supply of the agricultural property of the enterprise Voli, in the area of Šas, the Municipality of Ulcinj, 2018/19.
  • Design and construction of the infrastructure for capping (sealing) and transportation of water for air conditioning of the facilities Hotel Hilton, Capital Centar, Europoint, Distribution center Voli, 2016/20.
  • Geotechnical researches of the terrain and preparation of the Survey report for the purpose of the project of the construction of gondola on the locality Đalovića pećine (Djalovica Cave), Investor: Novi Volvox, 2018.
  • Reconstruction of Slobodana Škerovića street located in Drač, Investor: Agency for Construction and Development of Podgorica, 2021.
  • Maintenance of hydrotechnical installations of CEDIS facilities, Investor: Montenegrin Electricity Distribution System (CEDIS), 2020/21.
  • Maintenance of hydrotechnical installations of CEDIS facilities, Investor: Montenegrin Electricity Distribution System (CEDIS), 2020/21.
  • Construction of the water supply system Medanovići 2, Investor: Department for Construction and Investments, the Municipality of Bijelo Polje, 2020/21.
  • Construction of the connection of the Municipality of Herceg Novi to the regional water supply system, Investor: Regionalni vodovod (Regional Water Supply Company), 2020/21.
  • Construction of the water supply infrastructure in the rural areas in the municipalities of Nikšić, Šavnik, Žabljak, Bijelo Polje, Berane and Petnjica, Investor: Ministry of Agriculture and Rural Development, 2020.
  • Performance of the works on the creation of the artificial lakes (accumulations) in the area of the Municipality of Nikšić, Investor: Ministry of Agriculture, 2020.
  • Construction of the water supply branch in the scope of LSL (Local Study Location) Poljane, Investor: the Municipality of Budva, 2020.
  • Construction of the water supply system and reservoir Goja-Metanjac, Investor: Department for Construction and Investments, the Municipality of Bijelo Polje, 2019.
  • Construction and upgrade of the water supply system of Zaton, the Municipality of Bijelo Polje, Investor: Directorate of Public Works, 2019/20.
    Construction of the infrastructure for the water supply and sewage, and cable underground installation, with the creation of the lighting system at the rest stop Gornje Mrke at the segment 1 of the highway Bar-Boljare, Investor: CRBC, 2019/21 .
  • Construction of the reservoir for the settlement of Kakaricka gora, Investor: Vodovod i kanalizacija doo (Water Supply and Sewage Company, Ltd.), Podgorica, 2019.
  • Recovery of the landslide ,,Markovići” on the main road Cetinje-Budva, the third (III) phase, Investor: Directorate for Traffic, 2019/21.
  • Construction of the infrastructure for the cable underground sewage system of the voltage level 20kV on the highway Bar-Boljare, Investor: CRBC, 2019/21.
  • Design and construction of the water supply system of the hotel complex on Ada Bojana, Investor: HTP (Hotel and Tourist Enterprise) Ulcinjska Rivijera AD (joint-stock company), 2019/21.
  • The main design of the settling tank and the recovery of the settling tank at the water source Podgor, and the construction of the facilities in accordance with the Main design, Investor: Vodovod i kanalizacija (Water Supply and Sewage Company), Cetinje, 2019.
  • Creation of the infrastructural connections of the resort Porto Novi, Investor: Azmont Investments, 2018/19.
  • Construction – finishing works and landscaping of the terrain within the construction of the business facility in Bar, Investor: Kips doo. (Ltd.), 2018
    Construction of the reservoir for Gornji Vranići, Investor: Vodovod i kanalizacija doo (Water Supply and Sewage Company, Ltd.), Podgorica, 2018.
  • Connecting of the airport ,,Tivat” to the sewage system of the Municipality of Tivat, Investor: Aerodromi Crne Gore AD (Airports of Montenegro, joint-stock company), 2018.
  • Design and construction of hydromechanical installations for the water supply of the segments 1, 2, 3 and 4 of the highway Bar-Boljare, section Smokovac-Mateševo, Investor: CRBC, 2016.
  • Design and construction of the infrastructure for capping (sealing) and transportation of water for air conditioning of the facilities: Hotel Hilton, Capital Centar, Europoint, Distribution center Voli, 2016/20.
  • Preparation of the Cadastre of the water terrain on the territory of the entire Montenegro, Investor: Water Administration, 2020.
  • Preparation of the Cadastre of the water sources for the public water supply – the second (II) phase, Investor: Ministry of Agriculture and Rural Development, 2019.
  • Design and construction of the irrigation system for the Main town park in Tivat, Investor: the Municipality of Tivat, 2018.
  • Installation (Incorporation) of the bentonite barrier, HDPE geomembrane and geotextile on the landfill site Vasove vode in Berane, Investor: IGP Fidija, 2018.
  • Installation of the chlorine equipment for the water supply system Mosori – Donji Rsojevići, Investor: Vodovod (Water Supply Company) Danilovgrad, 2017.
  • Installation of the chlorine equipment for the water supply system for Donji Zagarač, Investor: Water Supply Company Danilovgrad, 2017.
  • Design and construction of the source for the water supply of the segments 1, 2 and 4 of the highway Bar-Boljare, section Smokovac-Mateševo, Investor: CRBC, 2016.
  • Design and construction of the hydromechanical installations for the water supply of the segments 1, 2, 3 and 4 of the highway Bar-Boljare, section Smokovac-Mateševo, Investor: CRBC, 2016.
  • Design and construction of the system for capping and combustion of biogas on the landfill site in Bar, Investor: Deponija Možura (Možura landfill), 2016.
    Explorations with the aim of defining the scope and manner of the soil remediation in the scope of the resort Porto Novi, Azmont Investment, 2014/16.

Photo Gallery