Performance of the remaining works on the Boulevard toward Tuzi until the end of the area of the Detailed Urban Plan (DUP) "Konik-Stari Aerodrom III" up to the bridge on the river of Cijevna
Investitor: Agency for Construction and Development of Podgorica
Construction of the extension of the pipeline Prijevor – Lastva
Investitor: Regional water supply company Montenegrin seaside
Performance of the works on the reconstruction of the water supply network on Dajbabska gora, the first (I) phase
Investitor: Directorate of Public Works
Construction of the exploitation wells for the water supply of the parks in Podgorica
Investitor:
Construction of the dynamic floor fountain at the city square, according to the “design and build” principle
Investitor: Department for Construction and Investments, the Municipality of Bijelo Polje
Construction of the traffic road with the parking lots in the area of Detailed Urban Plan (DUP) "Blok 35-36"
Investitor: Agency for Construction and Development of Podgorica
Performance of the works on the reconstruction of the water supply network on Dajbabska gora, the first (I) phase
Investitor: Vodovod i kanalizacija (Water Supply and Sewage Company) Podgorica
Recovery of the local road in the Local community Srbina
Investitor: Municipality of Herceg Novi
Preparation of the detailed geotechnical researches for the needs of the recovery of the landfill III-10B – Section 3 for the highway Bar-Boljare
Investitor: China road and bridge coorporation
Preparation of the Cadastre of the water terrain on the territory of the entire Montenegro